Europe's datacenter pipeline has expanded to nearly 500 GW, significantly driving future power demand and creating a generational investment opportunity in energy infrastructure. Utilities and power generation firms are positioned as key enablers of this AI-driven infrastructure boom.
Key Takeaways
- 1.European datacenter power connection requests have surged to 480 GW, representing 1.5x current total power demand.
- 2.Hyperscaler AI infrastructure spending is projected to reach nearly $1 trillion in 2027, a tenfold increase from 2023 levels.
- 3.Agentic AI is an under-recognized catalyst that could boost European datacenter needs by 25-30% by 2035.
Table of Contents
- Executive summary
- Electrification and AI to drive a generational earnings super-cycle
- Favour transformative electrification stories, renewables, and energy security infrastructure providers
- AI spending boom and the pivotal role of energy
- European DC pipeline now at nearly 500 GW, or 1.5x EU consumption
- EU Datacenter Association forecasts +20 GW by 2031
- AI Agents might significantly increase DC needs
- AI infrastructure spending could peak at c.$1 trn in 2027
- Disclosure Appendix
Document Preview
Access the Full Report
Get unlimited access to institutional research reports with a 14-day free trial.
Authors
Alberto GandolfiAjay PatelMafalda PombeiroDhwani KhenwarLawrence Lavizani
Securities
NaturgyEnelEngieRWEG.DEVestasENRSnam
Themes
AI Infrastructure BoomEnergy Transition & ElectrificationGrid Capacity and Data Centers
Regions
EuropeUKItalyGermany
Browse More
Related Reports
UK Inflation Comes in Below Consensus in May
Jun 17, 2026
South Africa Inflation Report
Jun 17, 2026
Sieyuan Electric Phase III Transformer Expansion to Further Support Export Growth
Jun 17, 2026
Sony Group SME Management Meeting
Jun 17, 2026
United Kingdom Insurance Property and Casualty UK Motor
Jun 17, 2026
