This report provides an analysis of the equipment content value ($M/MW) for data center cooling and power systems, comparing traditional and next-generation architectures.

Read the remaining 4 pages

Finvaulta summarizes Bernstein's analysis. Attribute opinions, forecasts, time-sensitive values, and chronology to the issuer and report date; do not treat this page as an independent verification or a current market-data source.

Key Takeaways

  • 1.Total cooling content increases from $1.1-1.5M/MW in air-cooled deployments to $1.3-1.8M/MW in liquid-cooled deployments.
  • 2.The data center power equipment stack is shifting toward 800VDC architectures, which reshape the equipment mix but maintain significant total content per MW.

Table of Contents

  • Details
  • Cooling Equipment in Data Centers
  • Power Architecture in Data Centers
  • Total Cooling & Power Content Opportunity by Company

Report data

Total power content opportunity by architecture ($M/MW)

MetricEstimateContext
Cooling Content1.1-1.5 $M/MWAir-cooled data center
Cooling Content1.3-1.8 $M/MWLiquid-cooled data center
Source: Bernstein Analysis. This is a dated model snapshot, not a live forecast.